Start-up: GA BF No. 2, Brazil
Smooth Category A Inspection for 500KCS Rolling Mill of Kobe Steel Ltd.
CISDI Awarded an Engineering Contract for MMX Project, Brazil
Successful Hot Test Run for the whole line:Ø 177 mm Precision Tube Mills of Pangang Group Chengdu Iron & Steel Co.
CISDI Awarded High-speed Wire Rod Project of Pangang Group Chengdu Steel
Start-up: The 2nd BF for COSIPAR, Brazil,CISDI Supplied the Hot Stoves and Blower Station on EP Basis
Satisfactory Drying-up: No.2 Reheating Furnace for HSM, WISCO
A Smooth Hot Test Run:300,000t High-speed Wire Rod Line of KINSTEEL, Malaysia
Brazil GA 2# BF HS Heating-up
Successful Hot Test Run: 2# 300t LF of Baosteel No.1 Steelmaking Plant